Guides
Permits, logs, and the water test
A driller's license and a construction permit are different approvals. These guides explain the well log, abandoned wells, setbacks, and the water test you still need after the hole is drilled.
Try a ZIP like 30303, “Travis County” or “Columbus, OH”
permits
licensing
Licensed driller versus pump installer
Why many states license well construction and pump installation as separate credentials, and how to ask which one covers the job.
Read the guide →How to check a well driller license
How to confirm a driller or pump installer credential on the state lookup, including class, expiration, and the type of well.
Read the guide →